| Regulatory and Quality-System Compliance |
15% |
Quality certificates, product registration documents, technical files, and applicable electrical-safety documentation. |
Current documentation available for every regulated product; applicable quality management certification is independently verifiable. |
4 |
12.0 |
Before approval and annually |
Verified |
| Clinical Equipment Fit |
15% |
Product specifications, workflow demonstrations, compatibility lists, and input from veterinarians and technicians. |
Equipment supports current treatment volume, species mix, room layout, and planned clinical services without major workflow changes. |
4 |
12.0 |
Before purchase and during expansion planning |
Verified |
| Patient and Operator Safety |
15% |
Risk assessments, alarm specifications, maintenance instructions, user manuals, and safety test records. |
Safety alarms, emergency controls, cleaning procedures, and preventive-maintenance requirements are clearly documented and practical. |
5 |
15.0 |
Before installation and after major updates |
Verified |
| Technical Support Response |
12% |
Service-level agreement, support channels, escalation process, and records from reference users. |
Remote response within one business day; defined escalation for critical failures; local or regional service coverage available. |
4 |
9.6 |
Before contract signing and quarterly |
Verified |
| Spare Parts and Consumables Availability |
10% |
Parts catalogue, stock policy, lead-time data, component obsolescence policy, and recommended critical-spares list. |
Common replacement parts are normally available within 5–10 business days; critical spares are identified for on-site stock. |
3 |
6.0 |
Before purchase and every six months |
Partially Verified |
| Training and User Competency |
8% |
Installation training plan, competency checklist, refresher-training schedule, and educational materials. |
Hands-on training is provided for operators, with documented competency verification and refresher support after staff turnover. |
4 |
6.4 |
At installation and annually |
Verified |
| Installation and Integration Capability |
8% |
Site survey, utility requirements, delivery checklist, commissioning report, and integration specifications. |
Supplier provides site planning, documented commissioning, staff handover, and compatibility confirmation with existing systems. |
4 |
6.4 |
Before delivery and at commissioning |
Verified |
| Total Cost of Ownership |
7% |
Five-year cost model covering purchase, installation, consumables, maintenance, calibration, training, and disposal. |
Five-year ownership cost is transparent, with predictable service charges and no unexplained recurring fees. |
3 |
4.2 |
Before purchase and annually |
Partially Verified |
| Delivery Reliability |
5% |
Written lead-time commitment, delivery history, logistics process, and contingency plan for delays. |
Standard equipment is delivered within the agreed project schedule, with documented communication for delays or shortages. |
4 |
4.0 |
Before order and for every project |
Verified |
| Warranty and Contract Protection |
3% |
Warranty terms, exclusions, response commitments, return process, and corrective-action procedure. |
Warranty coverage, exclusions, service response, and replacement responsibilities are stated clearly in the purchase contract. |
4 |
2.4 |
Before contract signing |
Verified |
| Data Security and Software Continuity |
2% |
Software support policy, access controls, backup requirements, update history, and data-export capabilities. |
System access is controlled, data can be exported, updates are documented, and support continues for the expected equipment life. |
3 |
1.2 |
Before integration and annually |
Planned Review |